- Engineering services and equipmentVacuum evaporation plant Decanter centrifuges, separatorsCrushers for grinding cereal crops in the process of feed, flour, ethanol productionControl and measuring instruments, sensors, flow meters for production automationDesign, construction of a distillery, distillationSpiral shell and tube heat exchangerIndustrial dryersSolid fuel boilersEnzymes, alcohol yeast, antiseptics for the production of alcoholEnergy auditSteam industrial boilers
- Design, construction of a distillery, distillation
- Construction of a bioethanol plant with a capacity of 3000 dal
Construction of a bioethanol plant with a capacity of 3000 dal
Overview

Alcohol, bioethanol, construction of distilleries, bioethanol plants, alternative fuels production plants, ethanol production plants, design of distilleries, design of bioethanol production plants.
Construction of a plant with a capacity of 3000 dal per day.
Corn, wheat, molasses and other types of starch-containing raw materials can be used as raw materials for the production of bioethanol.
The design and construction of a bioethanol plant can be divided into the following sequential stages:
* Pre-project work
• Project development
* Project expertise
* Obtaining permission to start construction
• Construction
• Commissioning
• Production certification
• Production output
pre-project work
Pre-project work includes
* Development of technical specifications (customer + designer)
* Obtaining urban planning conditions and restrictions on the site;
* Obtaining technical specifications for the connection of energy carriers.
* Obtaining a technical specification for the production of bioethanol (purchase)
* Development of regulations for the production of bioethanol
Project development
The design of the object of the class of consequences of SS3 is carried out in three stages
1. Feasibility study stage (feasibility study)
2. Stage P (project)
3. Stage W (working documentation)
project expertise
It is carried out in a specialized organization that has a permit for the examination of projects with the CC3 impact class. Stage P is submitted for examination.
Obtaining a permit to start construction takes place in DABI after receiving a positive expert opinion.
Construction
Construction can be divided into several stages:
* Preparatory work
• General construction works
* Installation of process equipment
* Landscaping
Characteristics
Producer | BTS Engineering |
Type | service |
Consumption of hot steam, kg/liter (6 bar) | 2,5 – 4,0 |
Electricity consumption, kW/liter | 0,5 |
Artesian water, m3/liter | 0,002 |
Consumption of circulating water, m3/liter (at the exit of the cooling tower 20˚C) | 0,2 |
Consumption of fossil fuels, nm3/liter (on the example of natural gas) | 0,2 – 0,32 |
Raw | grain crops, molasses, stream |
Productivity, liter/day | 5000–100000 |
Post-alcohol processing bards | Yes |
The presence of ACS TP | Yes |
Logistics data: |